-
Wheel Loader Spare Parts
-
Wheel Loader Engine Parts
-
Wheel Loader Transmission Parts
-
LiuGong Spare Parts
-
ZF Transmission Parts
-
Cummins Engine Parts
-
Excavator Spare Parts
-
Road Roller Parts
-
Forklift Spare Parts
-
Diesel Engine Spare Parts
-
Motor Grader Parts
-
Backhoe Loader Parts
-
Bulldozer Spare Parts
-
Road Construction Machine
-
Other Band Parts
Steering Unit Loader Machine Parts SP115987
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xColor | BLACK | Part No. | 145481 |
---|---|---|---|
Weight | 0.5 Kg | Installation Site | Transmission |
Name | Oil Filter | Model Namber | SP115987 |
Highlight | Loader Machine Parts SP115987,Loader Machine Steering Unit |
· Place of Origin: China
· Model Number: SP115987 145481
· Name: Oil filter
· Warranty: 3 Months
· Delivery: 1-7 Working Days
· Stock quantity: available
Packaging & Delivery :
Packaging Details:Box
Port: Guangzhou /Shen Zhen
Lead Time: Shipped in 1 day after payment
Backhoe loader commonly known as "busy at both ends". The structure of the whole machine is to load the working device on the front end of the four-wheel drive chassis and excavate the working device on the back end, which can realize the loading and digging function on one machine. Both ends can also be installed with lifting arm, fork, pressure, hammer, sweep, crushing hammer, vibration tamper, four-in-one bucket, series of excavating bucket and dozens of different tools, to complete the carrying, digging, crushing, hoisting, clamping, disassembly, tamping, milling and other work.
The four-wheel drive chassis has strong traction, and the multi-speed gearbox enables the maximum speed of the whole machine to reach 22km/h. It can quickly reach the construction site without a trailer and efficiently complete all kinds of work.
To sum up, the two busy three characteristics: before loading after digging, a machine multi - capability, fast mobility. 1 excavator loader > 1 small loader +1 small excavator.
|
||||||
NO. | Part NO. | Old Part No. | Nomenclature | Q'ty | ||
1 | 145481 | 130168/SP111045 | Steering arm assy | SP115987 | 2 | |
2 | 350878 | 356446/SP109243 | Spherical joint | SP119170 | 2 | |
3 | 070787 | 022183/SP109301 | Nut M18x1,5 | SP119214 | 2 | |
4 | 351144 | 350669/SP109242 | Tie rod | SP119171 | 2 | |
5 | 139495 | 130167/SP111046 | Steering cylinder | SP119139 | 1 | |
6 | 128534 | Bolt M12x45 | SP109306 | 4 | ||
7 | 024210 | Greaser nipple M6x1 | SP115942 | 2 | ||
8 | 126922 | 126921/SP110986 | Bolt M12x1.75x30 | SP119121 | 12 | |
9 | 128880 | 128904/SP109207 | King pin | SP119123 | 2 | |
10 | 145265 | 144381/SP111049 | Swivel housing LH | SP119160 | 1 | |
11 | 022431 | 022437/SP109300 | ||||
King pin | SP119124 | 2 | ||||
13 | 024211 | Greaser nipple M6x1 | SP115943 | 2 | ||
14 | 145264 | 144386/SP111017 | Swivel housing RH | SP119159 | 1 | |
15 | 022129 | 622129/SP109302 | Nut M16 | SP119189 | 2 | |
16 | 127223 | 124748/SP109307 | Bolt M16x75 | SP119122 | 2 | |
17 | 125390 | 125396/SP109198 | Bush | SP115965 | 2 | |
18 | 049084 | 049121/ SP110964 | Cylinder head | SP119202 | 1 | |
19 | 049210 | 049122/ SP109245 | Oil seal kit | SP115957 | 1 | |
20 | 144485 | Oil seal ring | SP109239 | 2 | ||
21 | 049083 | 049135/ | Rod | SP119201 | 1 |
Our advantages :
1. We can help buyers design specific products or produce products according to buyers' design.
2. Small order acceptable.
3. Competitive price be offered.
4. Inquiry or question be answered within 12 hours.
5. Best possible after-sales service.
6. We can print logo according to buyers' requirement.
7. Stock an extensive range of spare parts.
8. Favourable geographical location.
9. Flexible pricing, offers discount and deferred payment for wholesale buyers.
10. Timely delivery.
FAQ:
Q1. Could you custom products?
A: We can manufacture it according to your drawings or samples.
Q2. What's your payment terms.
A: By T/T or Western Union, 100% in advance. ( large orders can be negociated)
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: 1-3 working days in general, and 7-10 days for large orders.
Q5. How can you guarantee the quality?
A: One year's warranty against B/L date.If You meet with quality problem, we promise to responsible for it.
Q6: Can we buy 1 pc of each item for quality testing?
A: Yes, we understand quality test is important and we are glad to send 1pc for quality testing.
Tags: heavy duty,agricultural,construction machinery,new construction equipment, carrying, digging, crushing, hoisting, clamping, disassembly, tamping, milling